ABOUT THE PROJECT
The first step of the project was to determine the problems in our intersection in order to determine the Purpose and Needs of this project.

PROBLEMS
- Inappropriate left turns 
- Speeding 
- Fire Hazards 
- Demolished Gas Station 
- Vertical Curve 
- Sight Distance 
- Lane Designation 

PURPOSE
The purpose of the Project is to address operational issues at the intersection of State Route 2 and State Route 138 in order to accommodate current and future traffic volumes, alleviate congestion, and reduce accidents.

NEEDS
1- Improve operations in the vicinity of   the State Route 2 and State Route 138 intersection.
2-  Reduce seasonal backups on           westbound State Route 138 east of the     intersection.
3- Reduce collisions at and around the     State Route 2 and State Route 138 intersection.
4- Accommodate increasing   traffic volumes on State Route 138.